Airport case study
Case study · Valencia Airport, Spain

Cutting terminal HVAC energy by 21% with two HVLS fans

A 4,645 m² section of a passenger terminal was cooled and heated by a conventional HVAC system working against the building. Two 7.3 m high-volume, low-speed fans kept passengers comfortable at a higher set point, and metered HVAC energy fell on every day of the trial. The results were so convincing that Aena has since installed HVLS fans in 20 airports across Spain.

21%less HVAC energy, as metered
–kWh saved every day
–payback at the trial energy price
–saved per year in the test area

Energy data recorded during on-site trials at Valencia Airport.

01The challenge

Airport terminals are among the hardest spaces to keep comfortable: high ceilings, large glazed areas, constant passenger flow and air conditioning that runs for most of the year. In the hot Valencian summer the terminal relied heavily on cooling. In winter the opposite problem appeared. Warm air from the heating rose to the roof and stratified (layered), leaving more than 5°C between the upper and lower floors, with the heat sitting where nobody needed it.

4,645 m²test area, about 50,000 ft²
2HVLS fans in the test area
7.3 mfan diameter, same as AirMax 730
>5°Cwinter difference, upper to lower floor

02The solution

Two HVLS fans were hung in the test section alongside the existing HVAC system. Turning slowly, each one moves a large column of air down to the floor, where it spreads out across the terminal. Nothing else about the heating or cooling system had to change.

How the fans change the terminal

The 4,645 m² test area in 3D. Each particle is a parcel of air: orange shows the slow destratification airflow in winter, blue the faster cooling airflow in summer. Step through the scenes, or drag to look around.

Schematic view. Colours are illustrative; the more-than-5°C difference between the upper and lower floors was recorded at Valencia.

Summer: cooling without the cost

The large, slow-moving column of air creates a gentle, constant breeze at floor level. For passengers this feels 4–5°C cooler, so the airport could raise the HVAC set point and still keep the terminal comfortable, saving energy every hour the system runs.

Winter: heat back where people are

Running slowly, the fans push warm air down from the roof and mix it through the space. The terminal moves from stratified (layered) to destratified (even), holding a consistent temperature floor to ceiling while the heating works less.

Watch the video

See HVLS fans at work in a large space.

Watch on YouTube →

03The results

To produce a fair comparison, the air conditioning and ventilation serving the test area were isolated and metered, and spot checks were made on how comfortable passengers felt. Over 15 days, average HVAC energy fell from 7,258 kWh a day without the fans to 5,729 kWh a day with them: 1,529 kWh a day, a 21% reduction.

Energy data recorded during on-site trials at Valencia Airport.

HVAC energy was lower on every day of the trial

HVAC energy per day, kWh

Without fansWith HVLS fans

04The outcome

The trial was so successful that Aena rolled HVLS fans out across its network.

20airports with HVLS fans

From one terminal trial to 20 airports

Following the results at Valencia, Aena has installed HVLS fans in 20 airports across mainland Spain, the Balearic Islands and the Canary Islands.

  • Mainland Spain
  • Balearic Islands
  • Canary Islands
See our Airports page

05Payback and return on investment

Set the electricity price, installed cost and expected price rise to see the payback and 10-year return. Both columns use the daily saving measured at Valencia; the right-hand column projects it across all three terminals.

€/kWh

Enter your current rate. The trial used €0.11/kWh.

€
% a year

Applied to years 2–10.

Test area · 2 fans, as metered

Payback
Saving, year 1
Net saving over 10 years
10-year return on investment

All three terminals · projected

Payback
Saving, year 1
Net saving over 10 years
10-year return on investment

Cumulative savings against installed cost, test area

Cumulative savingInstalled cost

0610-year savings

Year-by-year savings at the price and assumptions set above. The highlighted row is the year the test-area investment pays back.

Saving that yearCumulative, after installed costEnergy saved
YearTest areaAll terminalsTest areaAll terminalsTest area, to date

07How the figures were calculated

  • Data source: energy data recorded during on-site trials at Valencia Airport.
  • Measured period: 15 days with the fans running and 15 days without, with the HVAC and ventilation serving the test area isolated and metered. Average use fell from 7,258 kWh/day to 5,729 kWh/day.
  • Annual figures: the measured daily saving of 1,529 kWh is applied to 360 operating days a year, giving about 550 MWh a year in the test area.
  • All three terminals: a projection that assumes the same saving and installed cost per terminal, three times the test area.
  • Installed cost: the installed costs were based on 2010 prices. Enter your own quotation for an accurate figure at today's prices.
  • Not included: fan electricity, maintenance, and any change in weather, operating hours or passenger numbers between the two periods. Results at other sites depend on building height, HVAC system and use.

Explore airflow for your airport

Talk to MegaFan about passenger comfort, air circulation and making better use of your existing heating and cooling systems.

Discuss your project ↗